Site visit to Frejus Exploratory tunnel:
Segment Factory:
40 ton crane at the main portal of the jobsite. |
Segment Factory:
Segment mould with anchored gaskets installed and oiled. |
Concrete casting of the key segment. |
Connector socket and spacer for the reinforcement. |
Forklifts for the segments handling. |
Anchored gasket installation on the mould. |
Longitudinal joint of the segment with guiding rod. |
Invert precast segments. |
Segments stockage area. |
Underground TBM assembly cavern:
TBM's shield and cutterhead during assembly. |
Lifting device for the assembly of the TBM's shield components. |
Overhead crane for the assembly of the backup. |
Main bearing of the TBM. |
Launching pit of the TBM. |