Site visit to Frejus Exploratory tunnel:
Segment Factory:
![]() |
| 40 ton crane at the main portal of the jobsite. |
Segment Factory:
![]() |
| Segment mould with anchored gaskets installed and oiled. |
![]() |
| Concrete casting of the key segment. |
![]() |
| Connector socket and spacer for the reinforcement. |
![]() |
| Forklifts for the segments handling. |
![]() |
| Anchored gasket installation on the mould. |
![]() |
| Longitudinal joint of the segment with guiding rod. |
![]() |
| Invert precast segments. |
![]() |
| Segments stockage area. |
Underground TBM assembly cavern:
![]() |
| TBM's shield and cutterhead during assembly. |
![]() |
| Lifting device for the assembly of the TBM's shield components. |
![]() |
| Overhead crane for the assembly of the backup. |
![]() |
| Main bearing of the TBM. |
![]() |
| Launching pit of the TBM. |